Procedures Followed in Decision Making
Process including Channels of Supervision
| Norms set for
the discharge of function |
Rules,
Regulation, instruction, Manual and Records
for Discharging Function |
Directory of officers and employees |
Monthly
remuneration received by officers &
Employees including the system of
compensation as provided in regulations
| Budget
allocated to each agency including, plans
etc. |
Information available in electronic form
|
Particulars of facilities to citizens for
obtaining information |
Name,
Designations and other particulars of public
information officers |
| |
|
|
| |
CHAPTER -4
BUILDINGS AND HOUSING DEPARTMENT FOLLOWS
LATEST STATE PWD CODE OF MANUAL
[SECTION 4 (1) (B) (III) ] |
|
| |
|
|
| |
Activities of Buildings and Housing
Department:
Construction of Buildings. |
|
| |
|
|
| |
1 Construction of
Government buildings.
1.1 Buildings and Housing Department is
responsible for construction and maintenance
of buildings to be used for official
accommodation as well as for residential
purpose.
Construction of buildings under different
schemes is in progress.
The inventory of all assets is maintained by
the department.
1.2 Statistical information.
Maintenance of statistical information
regarding buildings in prescribed register
division-wise is one of the most important
activities.
1.2.1 In each division the permanent
register of buildings contains detail
information on type of construction, year of
construction, location of construction and
the plinth area etc.
1.3 Work proposals:-
1.3.1 For building works pertaining to other
departments based on their requirements the
proposals are prepared either using the type
designs or using the special drawings as
approved by the Chief Architect in
consultation with the Chief Engineer are
prepared for the purpose.
1.3.2 For turnkey projects: Works to be
taken up through private firms, the detailed
preliminary and final feasibility report is
done either departmentally or through
consultants appointed for the purpose and
proposals are placed before the government
for according approval of the projects.
1.4 Administrative approval:
1..4.1 The estimates for building works are
prepared based on the current S.O.R.
approved by the government for working out
the cost of the project.
1.4.2 The estimate so prepared alongwith the
drawings on which the estimate is based is
submitted to the competent authority for
according administrative approval to the
project.
1.4.3 Necessary preconditions for taking up
the works are specified in the orders for
according administrative approval. The first
and the foremost being availability of the
requisite funds through budget provisions.
Strict instructions are contained in the
administrative approval informing the
departments not to incur any liability
unless the funds are arranged as above.
1.5 Sanction of estimates:
After the administrative approval is
accorded, the estimate is further submitted
for sanction by the competent authority. |
|
| |
|
|
| |
1.6 Technical
sanction:
Technical sanction is accorded to the detail
estimate approved by the competent authority
based on approved prevailing schedule of
rate.
1.6.1 Schedule of Rates:
The Estimated for works are based on the
Govt. approved schedule of rate which is
revised from time to time.
1.6.2 Land acquisition:
The land acquisition is required for
construction of buildings. The department
formulates and pursues land acquisition
cases for new building projects and also the
court cases related to the project.
1.7 Invitation of bids:
The agency for execution of works is fixed
by floating NIT. In this regard tender
notice is floated through the I.P.R
Department for wide publicity in the
interest of the public.
1.7.1 Processing:
Tenders so received are processed as per the
procedure given in P.W.D code and manual.
These are scrutinized by competent committee
and comparative statements are prepared. The
offers received are compared with the
updated cost of work as per the current
schedule of rates of the department.
1.7.2 Lowest Offer:
The valid tenders are examined and the
lowest tender is the work provided the rate
quoted by him/her is found reasonable and
workable and work order is issued there to.
1.7.3 Commencement of work:
On issue of work order, a proper layout as
per approved drawings is marked in the
worksite keeping in view the land
boundaries.
1.7.4 Measurement and Payment:
The measurements of work completed during
the month and recorded and checked/cross
checked by the Engineer-in-charge competent
engineer before the bills are prepared for
payment. |
|
| |
|
|
| |
|
|
|