11th Five Year Plan |
|
| |
|
|
| |
PROPOSALS UNDER 11TH.
FIVE YEAR PLAN (2007-12) |
|
| |
|
|
| |
BUILDINGS & HOUSING DEPARTMENT
GOVERNMENT OF SIKKIM
GANGTOK |
|
| |
|
|
| |
HOUSING SECTOR :
After Sikkim merged with the Indian Union in
1975, the concept of Plan development
underwent a radical change which resulted in
a tremendous spurt in the development
activities. The rapid development and
socio-economic change coupled with
de-centralization of administration to the
districts and sub-division level, the need
for immediate establishment of
administrative centers at the districts and
sub-division level was inevitable. As per
government notification eight sub-divisions
were created by splitting the forth
districts. Thus the development of
infrastructural facilities at all the
sub-divisions was given equal priority in
the sectors covering socio-economic services
etc. The Sikkim Public Works (Buildings &
Housing) Department which is solely
responsible for the construction of
Residential and Non-Residential buildings of
the government throughout the state could
construct large number of residential
quarters at various districts till 10th Plan
period. Keeping in view the overall number
of government employees posted at Gangtok
and district and sub-division headquarters,
the housing facilities for the government
servants is still inadequate and therefore
emphasis is to be given in the 11th Plan to
provide more number of quarters for the
employees at Gangtok, District Headquarter,
Sub-Divisional Levels and other places.
Housing is a state subject and it is an
integral part of our policy of improvement
of human settlements and economic
development. Accordingly government has
given more emphasis in providing residential
accommodations to government servants. The
main idea behind this is to improve the
housing conditions of the inadequately
housed and to provide a minimum level of
basic services and amenities to all.
It further emphasises new construction and
up-gradation and housing for rental
purposes. Those government servants who are
provided with residential quarters are
liable to pay house rent and lease charge
which is deducted from their salary every
month resulting collection of government
revenue.
Keeping in view the above an outlay of Rs.
__4159.07__ lakhs is proposed under housing
sector which includes the spill over
liabilities on account of the ongoing scheme
taken up during the 10th Plan period. |
|
| |
|
|
| |
Tenth Plan 2002-2007-
A review.
During 10th Five Year Plan an outlay of Rs.
2500.00 lakhs had been agreed under Housing
with which it was targeted to construct 336
numbers of residential quarters of various
categories. During 10th Plan the Department
constructed 9 units of Cl-I, 11 units of Cl-II
and 14 units of Cl-III and 62 units of Cl-IV
quarters all over the State including Raj
Bhavan and judiciary. Works related to the
construction of these quarters such as land
acquisition, site development, approach
road, jhora training, boundary fencing,
drainage works were also taken up. Besides
construction of these quarters, the
Department undertook special repairs,
addition/alteration of existing staff
quarters in all four districts, renovation
of Ministers’ bungalows, Mintogang etc. as
well as restoration of monsoon damages by
providing retaining walls. The Department
also replaced old furniture with new sets in
the existing staff quarters and VIP
bungalows.
With the increase of population and for
better administration, different
Administrative Departments have been created
and as a result of which number of employees
have increased. The present accommodation
facility in different districts,
sub-divisions and blocks is not sufficient
to meet the demand. |
|
| |
|
|
| |
Summery of 10th Five Year Plan
2002-2007- Both for Housing and Public Works
Sector under Buildings & Housing Department.
Physical achievements during 10th Plan
period under Housing –Major Head “4216”. |
|
| |
|
|
| |
1. Construction of 3 units Class –I
quarters at Sichey Housing Colony.
2. Construction of 6 units Class – II
quarters at Sichey Housing Colony.
3. Construction of 12 units Class –III qtrs.
(2-Blocks) at Sichey Housing Colony.
4. Construction of 3 units Class –I qtrs. at
Nam Nang.
5. Construction of 3 units type –II qtrs. at
Raj Bhawan.
6. Construction of 3 units type –I qtrs. for
A.D.Cs at Raj Bhawan.
7. Construction of type IV quarters (50
units) at Raj Bhawan. |
|
| |
8. Construction of Cl-IV qtrs. (12
units) at Residential Complex for Judiciary
at Sichey.
9. Construction of Cl-II qtrs. (2 units) at
Residential Complex for Judiciary at Sichey.
10. Construction of Cl-III qtrs. (2 units)
at Residential Complex for Judiciary at
Sichey. |
|
| |
|
|
| |
Continuing project
under Housing
1. Construction of Staff qtrs. at SDM
Complex at Rongli.
Keeping in view further requirement of
residential accommodation for Government
servants, more no. of quarters have been
proposed in the 11th Plan for which
provision of Rs. __4159.07__ lakhs has been
kept for the Housing Sector. The scheme-wise
details are summarized below : -
4216- Capital Outlay on Housing
01 – Government Residential Buildings.
01.106- General Pool Accommodation.
60 – Construction (PWD). |
|
| |
|
|
| |
4216 - HOUSING SECTOR
60.45.71 – Staff quarters at Gangtok.
Proposed Plan Outlay -
Rs. 555.00 lakhs
A number of new projects have been proposed
for taking them during the 11th Plan period.
The major projects proposed are construction
of 6 units Cl-1 and 4 units Class-II qtrs.
at Development Area, Construction of qtrs.
for District Collector and SP (East) and
construction of 12 units Class-III qtrs. at
Development Area and Syari. |
|
| |
|
|
| |
60.00.72- Quarters at
Other Districts.
Proposed Plan Outlay
Rs. 730.00 lakhs
The district headquarter namely Mangan,
Gyalshing & Namchi are still facing shortage
of residential accommodation for the
government employees. Although it is very
difficult to fulfill the entire demand
during 11th Plan period efforts will be made
to construct some quarters during the 11th
Plan. It is proposed to construct 4 units Cl-I
qtrs., 8 units Cl-III qtrs., officers hostel
at Rabdentse, Staff qtrs. at at Mangan and
Namchi and Cl-I Single unit for District
Collector (North) at Mangan. |
|
| |
|
|
| |
60.00.73- Qtrs. at
Sub-Divisional Level.
Proposed Plan Outlay
Rs. 416.07 lakhs
The proposal is to construct staff qtrs. at
Soreng and Ravangla. It is also proposed to
complete the spill over works of staff
quarters at SDM complex at Rongli taken up
during the 10th Plan.
60.45.74- Quarters at other places.
Proposed Plan Outlay
Rs. 700.00 lakhs.
There will be requirement of large no. of
residential quarters for the staff and
officers to be posted in the Regional
Administrative Center, Karfectar. A
provision of Rs. 700.00 lakhs is proposed
during 11th Plan to construct such quarters
at Karfectar and Chisopani, South Sikkim. |
|
| |
|
|
| |
60.45.75- Quarters for
Ministers.
Proposed Plan Outlay
Rs. 500.00 lakhs
A provision of Rs. 500.00 lakhs has been
kept for additions/alteration/extension of
the existing VIPs bungalows as per need
during the 11th Plan period.
60.00.76- Additions/Alteration/Renovation
of Quarters.
Proposed Plan Outlay
Rs. 400.00 lakhs
Requirement of fund for the purpose of
renovation and repair of existing
residential bldgs. in the state had been
felt during the 10th Plan period due to
provision of meager amount under Non-plan
budget for maintenance and repairs. A great
number of quarters are in dilapidated
condition and needs major repairs and
renovation.
Although it is not possible to cater to all
the demands for repairs under 11th Plan
allocation, good number of these quarters
would be repaired and renovated which will
add to the value of the assets and also ease
up the inconvenience faced by the employees
of the state |
|
| |
|
|
| |
60.45.77- Quarters for
M.L.As.
Proposed Plan Outlay
Rs. 858.00 lakhs
Construction of 12 units of Duplex
apartments in multi storied buildings (Vidhayak
Awas) has been proposed under the 11th Plan
period to provide residential accommodation
for the MLAs in the State capital, Gangtok. |
|
| |
|
|
| |
PUBLIC WORKS SECTOR
“4059”
With the rapid development activities and
change of socio-economic policy of the
Government thereby bringing about
de-centralization of administration, the
need for establishment and augmentation of
administrative centre in the districts and
sub-
divisions is inevitable. After the creation
of 8 sub-divisions in addition to the
districts, the development of
infrastructural facilities at all
sub-divisions was given higher priority.
The Sikkim Public Works (Buildings &
Housing) Department is solely responsible
for the construction of Non-Residential
accommodations under Public Works. A great
emphasis was given in the 10th Plan period
to bring administration closer to the people
by way of de-centralization of the
administrative structure to village level.
For this purpose the basic infrastructure
viz. the office buildings in an around
Gangtok and in the districts and
sub-divisions have been covered.
Hence, the thrust area under Public Works
Department is construction of office
buildings in district Headquarter,
Sub-Division Level and at Gangtok. An outlay
of Rs. 28215.42 has been proposed in the
11th Plan for the purpose as well as to
complete the ongoing projects spilled over
from 10th Plan.
Physical achievement during 10th Plan period
under Public Works- Major Head –“4059”.
1. District Administrative Centre at Namchi.
2. Circuit House at Gangtok.
3. Chintan Bhawan (Convention all and
Banquet Hall)
4. Samman Bhawan
5. Guest House at Karfectar
6. Display Centre for Handloom and
Handicraft at Rangpo.
7. Security Check Post at Rangpo
8. Entrance gate for Raj Bhawan at Zero
Point.
9. Renovation of Varshey Guest House.
10. Ashirwad Bhawan at Raj Bhawan Complex.
11. Construction of Chain Link boundary
fencing around Raj Bhawan compound.
12. Construction of Toilet block for ITBPF
at Raj Bhawan
13. Extension and Renovation of Ministers
office at Tashiling.
14. High Court Building at Gangtok Phase-I
15. Chogyal P.T Namgyal Park. |
|
| |
|
|
| |
Major construction works
commenced/undertaken during 10th Plan but
would spill over to 11th Plan period. |
|
| |
|
|
| |
| SL.No |
4059- Public Works |
| 1 |
Construction of Guest House at
Kolkata |
| 2 |
Construction of Sherpa Community
Centre at Okharay |
| 3 |
Construction of RAC at Jorethang |
| 4 |
Construction of View Tower at
Pelling |
| 5 |
Construction of Multipurpose
Hall cum Gymnasium Hall for SAP at
Pangthang. |
| 6 |
Construction of DAC Annexe at
Namchi. |
| 7 |
Construction of SDM office
extension at Soreng |
| 8 |
Construction of SDM Office at
Rongli |
| 9 |
Construction of Approach Road to
SDM Complex at Rongli |
| 10 |
Construction of Infrastructure
Development work for Raj Bhawan
Complex. |
| 11 |
Judiciary Complex at Sichey
(50:50% State Share) |
| 12 |
High Court Phase –II |
|
|
| |
|
|
| |
(i) 4059 – Public Works.
80- General
001- Direction & Administration
40- Chief Engineer (Buildings) Estab.
004- Planning & Research. |
|
| |
|
|
| |
Proposed Plan Outlay
Rs. 700.00 lakhs.
An outlay of Rs. 700.00 lakhs has been
proposed for meeting up the administrative
expenses of the department, strengthening of
the materials testing laboratory and
planning & research activities, training to
the office personnel.
4059- Capital Outlay on Public Works.
01- Office Buildings
60- Other Buildings.
60.051- Construction
03- Buildings & Housing Department.
(ii) 03.45.71- Secretariat at Gangtok |
|
| |
|
|
| |
Proposed Plan Outlay
Rs. 50.00 lakhs
A sum of Rs. 50.00 lakhs has been proposed
for renovation alteration and additions in
the Tashiling Secretariat Building on
account of changes in the administrative set
up |
|
| |
|
|
| |
(iii) 03.45.72- Other
Office Complex Gangtok
Proposed Plan Outlay
Rs. 9000.00 lakhs
Secretariat Building Annexe
The present State Secretariat complex
comprises of four separate buildings where
the offices of Chief Minister and other
Ministers, Chief Secretary and senior
Secretaries of few Departments such as DPER
& NEC Affairs, DPART, Land Revenue, Home and
Finance & Revenue Expd., Cultural Affairs &
heritage, Health Care, Human services and
Family welfare Department, Bank, Post
office, staff canteen are located. Due to
shortage of space, many departments are
running in rented premises some of them
located quite far away from the main
secretariat thus creating difficulty in
co-ordination. There is also acute problem
of parking of vehicles as the existing car
park has proved very inadequate. With the
opening of Nathula Trade route, the need for
a proper and dignified State Secretariat has
been felt more and more. It was therefore
felt necessary to construct an annexe
building to accommodate the offices of Chief
Minister, Ministers, Chief Secretary and few
other Secretaries with their connected
officers and staff and shift the Departments
running in private premises to the
secretariat complex. The annexe building
will have a total built up area of 162142
Sq.ft. and will have car park for about 250
vehicles in the basement floor. The annexe
building will also have provision for
Cabinet room, Conference room, visitors’
lounge, computer rooms along with facilities
like covered car parking for VIPs., Bank,
post office, canteen, V-sat centre,
Electrical sub-station etc. etc. The cost of
the project arrived at adopting two bid
system is Rs. 90.00 crore. The construction
will commence once fund is arranged. |
|
| |
|
|
| |
(iv) 03.00.73- Office
Complex at District Headquarter
Proposed Plan Outlay
Rs. 376.77 lakhs
With the implementation of plan development
programme in all the districts more and more
physical infrastructure are required for
administrative purpose. Accordingly it is
proposed to construct D.A.C Annexe Building
at Gyalshing, the West District HQ and
extension of D.A.C at Mangan, the North
District HQ. The provision also take care of
spill over liabilities of construction of
DAC extension at Namchi, the South District
HQ. taken up duriong10th Plan. |
|
| |
|
|
| |
(V) 03.00.74- Office
Complex at Sub-Division Level.
Proposed Plan Outlay
Rs. 680.24 lakhs
The administrative infrastructures at
Sub-Division Level have been completed but
with decentralization of administration, the
need for immediate upgradation of
infrastructure in the Sub-Division Level is
very much felt. It is proposed to provide
extension of Sub-Divisional Magistrate
office at Ravongla and Pakyong. The above
provision also takes care of spill over
liabilities for the ongoing works of 10th
Five Year Plan projects viz. Extension of
SDM Complex at Rongli & Soreng. |
|
| |
|
|
| |
(VI) 03.45.75- Office
Complex for P.W.D
Proposed Plan Outlay
Rs. 300.00 lakhs
The Nirman Bhavan complex where Works
Departments like Roads & Bridges, Buildings
& Housing and PHE are located is facing
acute shortage of office space and parking
area for vehicles due to expansion of the
Departments and addition of Irrigation and
Flood Control Department in the same
premises. The present proposal
of Rs. 300.00 lakhs is for construction of
Annexure Building for Nirman Bhawan, with
adequate Car parking facilities. |
|
| |
|
|
| |
(VII) 03.45.76- Office
Complex for Judicial Administration(State
Share)
Proposed Plan Outlay
Rs. 500.00 lakhs
The physical infrastructure required for the
judiciary is in the process of development.
Fund required for creation of such
infrastructure is borne by the State and
Central on 50:50% basis. The Central
Government has so far released Rs. 1016.32
lakhs since the year 1994-95 till 2006-07
and the State has allocated Rs. 724.40 lakhs
for the same period. During 10th Plan the
Central Government has released Rs. 606.52
lakhs out of which Rs. 506.52 lakhs has been
allocated in the budget. For State Share an
allocation of Rs. 350.00 lakhs has been made
during the 10th Plan. The infrastructure
created so fare consists of High Court
Building Phase-I, Courts and residential
complex for district and session Judges,
Chief Judicial Magistrates and Civil
Judge-Cum-Judicial Magistrates at Namchi,
South Sikkim, acquisition of land and
construction of residential complex for
Judiciary at Sichey, Gangtok which is under
construction at present.
The proposed outlay of Rs. 500.00 lakhs as
State Share in the 11th Plan will provide
fund for development of infrastructure for
Judiciary all over the state as envisaged in
the 10th Year perspective plan. |
|
| |
|
|
| |
(VIII) 03.00.77-
Additions/Alteration/Renovation of Office
Buildings.
Proposed Plan Outlay
Rs. 50.00 lakhs
Various office buildings in the capital as
well as district and sub-divisional head
quarters require renovation, repairs as well
as alteration as per need of the users of
the office space. Such renovation and
refurbishing will add value to these assets
and is expected to increase efficiency in
performance. Since it would not be possible
to renovate all office buildings at a time,
it is being done in phase-wise manner. |
|
| |
|
|
| |
(IX) 03.45.71-
Construction of Raj Bhawan Annexe.
Proposed Plan Outlay
Rs. 1855.87 lakhs
A. Construction of new Raj Bhavan
The present Raj Bhavan built in 1890 has
been damaged by major earthquake on various
occasions, the latest one being the
earthquake on 14th February 2006 which has
rendered the building unsafe to live in. The
State Government has therefore decided to
construct a new Raj Bhavan in the vicinity.
The old structure will be conserved as a
heritage building. The new Raj Bhavan will
have total built up area of 26825 Sq.ft. and
it will cost Rs. 15.15 crore. The Vice
President of India recently laid the
foundation stone for the new Raj Bhavan on
19th August 2006. The construction will
commence as soon as fund is made available.
B. There are various works commenced during
10th Plan period for development of
infrastructure for Raj Bhavan such as
construction of 16 units Cl-III quarters,
works taken up to set up camp Raj Bhavan at
Circuit House which are continuing and
spilled over to 11th Plan. |
|
| |
|
|
| |
(X) 03.00.78- Other
Buildings.
Proposed Plan Outlay
Rs. 14402.54 lakhs.
Additional infrastructure like construction
of State Convention Centre at Gangtok office
complex for Sikkim Public Service
Commission, Election Department, IPR
Department, Social Welfare Department near
AIR Station at Gangtok, Construction of
Circuit House at Namchi are proposed. In
addition to above, other ongoing schemes of
10th Five Year Plan are also being taken up
viz. Construction of
Multipurpose-cum-Gymnasium Hall for Sikkim
Armed Police at Pangthang, Sherpa Community
Centre at Okherey, View Tower at Pelling
(West Sikkim), Regional Administrative
Centre at Jorethang, Guest House at Kolkata.
The fund provided above would also take care
of this spill over works. |
|
| |
|
|
| |
(XI) 03.45.79-
Strengthening and Renovation of Assembly
Building including Acoustics System
(Extension of building).
Proposed Plan Outlay
Rs. 300.00 lakhs
The present S.L.A building at Gangtok has
proved in inadequate and inconvenient for
the function of the House due to lack of
enough and proper rooms for various VIPs,
such as Leader of the House, Chairman of
various Committees, opposition leaders etc.
The toilets also need up-gradation and
renovation. It has therefore been proposed
to extend the Assembly building in such a
way that enough space is created for all,
the corridors are made wider and convenient,
entry to the Speaker’s dais is made direct
and short instead of the present circuitous
passage way. Underneath the extended
portion, the driveway will be maintained and
the existing parking facility also gets
enhanced. The work will cost approximately
Rs. 180.00 lakhs.
It is also proposed to add annexe block to
the present MLA hostel to accommodate more
visiting MLAs from other States. Altogether
5 new suites will be added along with a
convention cum meeting rooms, recreation
room etc. The project will cost
approximately Rs. 120.00 lakhs. |
|
| |
|
|
| |
District Plan
As already stated, the Buildings & Housing
Department is responsible for construction
of non-residential buildings for office
purpose of Government Departments as well as
residential buildings for quarters for
government employees in the state capital
Gangtok and district and sub-divisional head
quarters as per requirement of State
Government and availability of fund.
Panchayat level planning is not required to
be done, because of the fact that Panchayat
cannot assess the requirement as well as
take a decision in the matter. However,
suggestion of district planning committee is
taken in formulating the plan proposals of
the department. That is why the proposals in
the district plans invariably find place in
the department’s plan proposal. The district
wise proposals for the 11th Plan and Annual
Plan for 2007-08 for both Housing and Public
Works Sectors are indicated in GN Statement
B(Part-I) |
|
| |
|
|
| |
Tribal Sub Plan.
The Buildings & Housing Department
undertakes construction of non-residential
buildings for the office accommodation of
various government departments and
residential quarters for accommodation for
government employees in general. The
department does not construct office
buildings for any specific tribe, cast or
community. Similarly, the government
quarters are also not constructed for
employees of any particular tribe, cast or
community. As such, the proposal of the
department for 11th Plan and Annual Plan
cannot be categorized as tribal sub plan or
schedule caste sub plan in the strict sense.
However, for the purpose of showing
components of TSP and SCSP in the
department’s plan documents, the plan
proposals in the tribal or reserved
constituencies have been treated as schemes
or projects for the benefit of the tribals.
The annexure VI-A and VI B gives the
components of STP worked out on the basis of
above assumption. |
|
| |
|
|
| |
Principal Chief Engineer cum Secretary
Buildings & Housing Department
Government of Sikkim
Gangtok. |
|
| |
|
|
| |
|
|
| |
|
|